Sunday 11 August 2013

Back up the monty

Well after a night sleeping on a slope because the side was shallow and the pound was low we decided to have a lie in this morning seeing as the monty is only 7 miles long and we are here till monday, we set off about 1.45pm after making some bread seeing as i forgot to get some from ellesmere and decided to wind at the next winding hole which was a fete in itself as i don't think anyone uses them, it took us about 20 minutes to wind because it was only about 70 wide and 15 foot of it was silted up so had to use the pole, also there were rocks in the side about 2 foot from the bank which made it difficult, anyway off we went back to where we came from plus a little further because we like #fucknowswhere  :)

Old keepers hut
and inside























the other side of the board coming up

















Swing bridge to rednal basin disused

Turnover bridge














home made bread















Tonights view
                                                                        4  Miles 0 Locks

No comments:

Post a Comment